EPS@ISEP | The European Project Semester (EPS) at ISEP


Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
plan [2018/02/17 20:39] – [Deadlines] epsatisepplan [2018/06/25 12:57] (current) – [Gantt Chart] team2
Line 7: Line 7:
   * 2018-03-12 Upload the “black box” **System Diagrams & Structural Drafts** to the wiki   * 2018-03-12 Upload the “black box” **System Diagrams & Structural Drafts** to the wiki
   * 2018-03-23 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do the **cardboard scale model** of the structure   * 2018-03-23 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do the **cardboard scale model** of the structure
-  * 2018-04-03 Upload the **List of Materials (what & quantity)** to the wiki+  * 2018-04-04 Upload the **List of Materials (what & quantity)** to the wiki
   * 2018-04-14 Upload the **Interim Report and Presentation** to the wiki. The report must contain the Introduction, including the tasks, team members allocation and Gantt chart, State of the Art, Marketing Plan, Project Management, Eco-eficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography chapters   * 2018-04-14 Upload the **Interim Report and Presentation** to the wiki. The report must contain the Introduction, including the tasks, team members allocation and Gantt chart, State of the Art, Marketing Plan, Project Management, Eco-eficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography chapters
   * 2018-04-19 Interim Presentation, Discussion and Peer, Teacher and Supervisor Feedbacks   * 2018-04-19 Interim Presentation, Discussion and Peer, Teacher and Supervisor Feedbacks
Line 20: Line 20:
     - Hand in to the EPS coordinator:     - Hand in to the EPS coordinator:
       - a **CD with the corrected deliverables (source + PDF) together with all code and drawings produced**       - a **CD with the corrected deliverables (source + PDF) together with all code and drawings produced**
-      - a **printed copy of the corrected report**+      - a **printed copy of the corrected report and poster**
   * 2018-06-28:   * 2018-06-28:
     - Hand in the **prototype and user manual** to the client     - Hand in the **prototype and user manual** to the client
Line 27: Line 27:
 ===== Tasks ===== ===== Tasks =====
  
-^ Task      Responsible    Involved      +<WRAP box center centeralign 400px> 
-A         | X and Y        X, Y, Z, W    +^ Task ^ Responsibility ^ 
-B         Z              XY, Z, W       +^ Project Proposal   ^^ 
-C         W, Y and Z     X, Y, Z, W   +Task Identification and Allocation |The team
-D         W              X, Y, Z   +Gantt Chart|Sten| 
-E         W, X, Y and Z  X, Y, Z, W    +| Technical Research |Charlotte| 
-F         X              X, Y, Z, W  +| Market ResearchExisting products|Geert
-G         W and X        X, Y, Z, W |+Initial Budget Planning Mireia| 
 +^System Design^^ 
 +|Specific Plan| Sten and Hervé| 
 +|Business Plan| Hervé and Geert
 +|Final Schemes and DiagramsSten| 
 +^Interim^^ 
 +|Presentation| Charlotte
 +|ReportMireia| 
 +^Detailed Design^^ 
 +|Construction Hardware| Mireia
 +|Construction SoftwareSten| 
 +|Assembly| Geert| 
 +^Testing^^ 
 +|Functional TestsThe team| 
 +^Final^^ 
 +|Report| Geert| 
 +|Video| Charlotte| 
 +|Poster| Hervé| 
 +|Manual| Mireia|
  
 +</WRAP>
 ===== Gantt Chart ===== ===== Gantt Chart =====
-{{:gantt_chart.gif|}}+ 
 +{{:gantt_chart_part_1_v5.jpg?1000|}} 
 +{{:gantt_chart_part_2_v5.jpg?1000|}} 
 +{{:gantt_chart_part_3_v6.jpg?1000|}} 
 + 
 +{{ :gantt_chart_team_2.zip |}} 
 + 
QR Code
QR Code plan (generated for current page)