Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| report [2018/06/27 10:57] – [7.11 Conclusion] team2 | report [2018/06/27 11:55] (current) – [7.9 Assembly structure] team2 | ||
|---|---|---|---|
| Line 1377: | Line 1377: | ||
| </ | </ | ||
| </ | </ | ||
| - | |||
| - | == - Adjustments to final design == | ||
| - | |||
| == - Electrical Detail Schematics == | == - Electrical Detail Schematics == | ||
| Line 1708: | Line 1705: | ||
| |Charging module TP4056 | 20.0 | | |Charging module TP4056 | 20.0 | | ||
| |Battery | 43.8 | | |Battery | 43.8 | | ||
| - | |Panel | ~20 | | + | |Panel | 10.1 | |
| - | ^Sum ^ 517.4 ^ | + | ^Sum ^ 226.3 ^ |
| </ | </ | ||
| </ | </ | ||
| Line 1723: | Line 1720: | ||
| - | **Total mass of the buoy** (see table {{ref> | + | **Total mass of the buoy** (see table {{ref> |
| - | **Weight of the buoy:** P = W< | + | **Weight of the buoy:** P = W< |
| **Buoyant Force:** F< | **Buoyant Force:** F< | ||
| Line 1872: | Line 1869: | ||
| <WRAP centeralign> | <WRAP centeralign> | ||
| <figure br> | <figure br> | ||
| - | {{ :: | + | {{ :: |
| < | < | ||
| </ | </ | ||
| Line 1879: | Line 1876: | ||
| <WRAP centeralign> | <WRAP centeralign> | ||
| <figure br> | <figure br> | ||
| - | {{ :: | + | {{ :: |
| < | < | ||
| </ | </ | ||
| </ | </ | ||
| + | |||
| + | === Building Process === | ||
| + | |||
| + | To illustrate the process the team made some pictures while building the prototype. Figure {{ref> | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <figure bs1> | ||
| + | {{ : | ||
| + | < | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <figure bs2> | ||
| + | {{ : | ||
| + | < | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <figure fp> | ||
| + | {{ : | ||
| + | < | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | |||
| + | <WRAP centeralign> | ||
| + | <figure el> | ||
| + | {{ : | ||
| + | < | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | |||
| + | |||
| + | |||
| + | |||
| + | |||
| + | |||
| + | |||
| Line 1945: | Line 1983: | ||
| ==== - Conclusion ==== | ==== - Conclusion ==== | ||
| The project development was from the first drafts and modules until the final tests clear structured and well going. | The project development was from the first drafts and modules until the final tests clear structured and well going. | ||
| + | |||
| This chapter had addressed the logo and the software, besides some unexpected changes in the software part, satisfactory. | This chapter had addressed the logo and the software, besides some unexpected changes in the software part, satisfactory. | ||
| The electronics and the architecture needed to be changed several times until every detail fits to the requirements and in the end both were suiting perfectly to the initial vision. | The electronics and the architecture needed to be changed several times until every detail fits to the requirements and in the end both were suiting perfectly to the initial vision. | ||
| + | |||
| The electronic components and the material had been selected carefully and the tests show that the selection was successful. The team cannot trace the issues with the watertightness to the material decision but to the quality of the printing. | The electronic components and the material had been selected carefully and the tests show that the selection was successful. The team cannot trace the issues with the watertightness to the material decision but to the quality of the printing. | ||
| + | The next section concludes the whole project. | ||
| ===== - Conclusions ===== | ===== - Conclusions ===== | ||
| ==== - Discussion ==== | ==== - Discussion ==== | ||
| - | The main objective of the project was to motivate and unite the Team around the development of Aquality' | + | The main objective of the project was to motivate and unite the team around the development of Aquality' |
| - | The product under development is user-friendly, | + | The product under development is user-friendly, |
| - | Regarding the collaborative learning and teamwork, maintaining the motivation and unity of the Team was not always an easy task. The differences in culture, study fields and personalities can lead to frictions within the team. In the case of the Aquality' | + | Regarding the collaborative learning and teamwork, maintaining the motivation and unity of the team was not always an easy task. The differences in culture, study fields and personalities can lead to frictions within the team. In the case of the Aquality' |
| - | Quoting Sten Pajula, who was responsible for the electronics and coding of prototype, "The overall experience of the project has been positive. The weekly meetings with the supervisors and Team members | + | Quoting Sten Pajula, who was responsible for the electronics and coding of prototype, "The overall experience of the project has been positive. The weekly meetings with the supervisors and teammembers |
| ==== - Future Development ==== | ==== - Future Development ==== | ||
| Further development is necessary to transform the prototype into a product ready for release into the designated markets. The Aquality prototype is constrained by the time, budget, insufficient knowledge in some technical areas and lack of experience in product development. The following aspects should be considered for future development: | Further development is necessary to transform the prototype into a product ready for release into the designated markets. The Aquality prototype is constrained by the time, budget, insufficient knowledge in some technical areas and lack of experience in product development. The following aspects should be considered for future development: | ||