====== Work plan ====== ===== Deadlines ===== * 2018-02-26 Choose a project proposal and send your choice via email to epsatisep@gmail.com * 2018-03-05 Define the Tasks (what must be done - every member should preferably participate in every task), subtask allocation (who does what) and Gantt chart (when) of the project and insert them on the wiki (planning) * 2018-03-12 Upload the “black box” **System Diagrams & Structural Drafts** to the wiki * 2018-03-23 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do the **cardboard scale model** of the structure * 2018-04-04 Upload the **List of Materials (what & quantity)** to the wiki * 2018-04-14 Upload the **Interim Report and Presentation** to the wiki. The report must contain the Introduction, including the tasks, team members allocation and Gantt chart, State of the Art, Marketing Plan, Project Management, Eco-eficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography chapters * 2018-04-19 Interim Presentation, Discussion and Peer, Teacher and Supervisor Feedbacks * 2018-04-23 Complete the **List of Materials (local providers & price, including VAT and transportation)** to the wiki * 2018-05-02 Upload refined Interim Report (based on Teacher & Supervisor Feedbacks) * 2018-06-04 Upload the results of the **Functional Tests** to the wiki * 2018-06-15 Upload the **Final Report** * 2018-06-18 Upload the **Presentation, Video, Paper, Poster and Manual** * 2018-06-21 Final Presentation, Individual Discussion and Assessment * 2018-06-28: - Update the wiki with all correction suggestions - Hand in to the EPS coordinator: - a **CD with the corrected deliverables (source + PDF) together with all code and drawings produced** - a **printed copy of the corrected report and poster** * 2018-06-28: - Hand in the **prototype and user manual** to the client - Receive the **EPS@ISEP certificate** - Bring **typical food** from your country ===== Tasks ===== ^ Task ^ Responsibility ^ ^ Project Proposal ^^ | Task Identification and Allocation |The team| | Gantt Chart|Sten| | Technical Research |Charlotte| | Market Research, Existing products|Geert| | Initial Budget Planning | Mireia| ^System Design^^ |Specific Plan| Sten and Hervé| |Business Plan| Hervé and Geert| |Final Schemes and Diagrams| Sten| ^Interim^^ |Presentation| Charlotte| |Report| Mireia| ^Detailed Design^^ |Construction Hardware| Mireia| |Construction Software| Sten| |Assembly| Geert| ^Testing^^ |Functional Tests| The team| ^Final^^ |Report| Geert| |Video| Charlotte| |Poster| Hervé| |Manual| Mireia| ===== Gantt Chart ===== {{:gantt_chart_part_1_v5.jpg?1000|}} {{:gantt_chart_part_2_v5.jpg?1000|}} {{:gantt_chart_part_3_v6.jpg?1000|}} {{ :gantt_chart_team_2.zip |}}