2018-02-26 Choose a project proposal and send your choice via email to epsatisep@gmail.com
2018-03-05 Define the Tasks (what must be done - every member should preferably participate in every task), subtask allocation (who does what) and Gantt chart (when) of the project and insert them on the wiki (planning)
2018-03-12 Upload the “black box” System Diagrams & Structural Drafts to the wiki
2018-03-23 Upload the detailed System Schematics & Structural Drawings to the wiki and do the cardboard scale model of the structure
2018-04-04 Upload the List of Materials (what & quantity) to the wiki
2018-04-14 Upload the Interim Report and Presentation to the wiki. The report must contain the Introduction, including the tasks, team members allocation and Gantt chart, State of the Art, Marketing Plan, Project Management, Eco-eficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography chapters
2018-04-19 Interim Presentation, Discussion and Peer, Teacher and Supervisor Feedbacks
2018-04-23 Complete the List of Materials (local providers & price, including VAT and transportation) to the wiki
2018-05-02 Upload refined Interim Report (based on Teacher & Supervisor Feedbacks)
2018-06-04 Upload the results of the Functional Tests to the wiki
2018-06-15 Upload the Final Report
2018-06-18 Upload the Presentation, Video, Paper, Poster and Manual
2018-06-21 Final Presentation, Individual Discussion and Assessment
2018-06-28:
Update the wiki with all correction suggestions
Hand in to the EPS coordinator:
a CD with the corrected deliverables (source + PDF) together with all code and drawings produced
a printed copy of the corrected report and poster
2018-06-28:
Hand in the prototype and user manual to the client
Receive the EPS@ISEP certificate
Bring typical food from your country